Filtern und downloaden Sie spezifische Informationen nach Stichworten.
Sweden’s second-largest city, Göteborg, needed to strengthen its power grid to replace cables at the end of their lifetime. As part of its upgrade project with NKT at the start of 2020, it upgraded out 94 kilometres of first-generation PEX cables with new NKT cables.
Weiter zur SeiteSveriges näst största stad, Göteborg, behövde modernisera sitt kraftnät och byta ut uttjänta kablar. Som en del av uppgraderingsprojektet med NKT i början av 2020, ersattes 94 kilometer första generationens PEX-kablar med nya NKT-kablar.
Weiter zur SeiteNKT contributes to the green transformation of the UK power supply delivering export and array cable systems to Triton Knoll.
Weiter zur SeiteOur pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
Weiter zur SeiteUnderground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
Weiter zur SeiteThe Caithness-Moray project represents a £1.1bn capital investment by SSEN, centred on a submarine cable capable of carrying up to 1,200MW beneath the Moray Firth.
Weiter zur SeiteTurnkey project for 380 kV cable system for TenneT TSO - 132 km total length
Weiter zur SeiteThe Rentel offshore windfarm is located in the North Sea, approximately 34 km off the Belgian coastline. Thanks to the link, which reaches land close to Zeebrugge, the renewable energy project will contribute to the efforts that are being made to meet Belgium’s environmental objectives for 2020.
Weiter zur Seite