Vorgeschlagene Suchanfragen
Filtern und downloaden Sie spezifische Informationen nach Stichworten.
Covering a total of 623 kilometers, NordLink is an HVDC (high-voltage direct current) transmission link which will increase energy security in both countries, Norway and Germany.
Qaddy-kaapelikelat vauhdittamassa REDIn Majakkaa
Holmriis in Ebeltoft has started to use QABLE BOX from NKT in their service vans. This provides for a better overall economy when using cables and wires.
Holmriis i Ebeltoft er begyndt at anvende Qable box i sine servicebiler. Det betyder bedre totaløkonomi ved anvendelsen af kabler og ledninger.
Breezy southern Gotland was an early favorite for wind power. By the late 1990’s, the Swedish island had an installed wind power capacity of 40 MW (megawatt). To cope with additional wind power generation, the island grid needed an improved way of maintaining power quality.
Fra PVC (PVL) til halogenfri (NOVL). Vi udfaser PVL 1,5-2,5 mm², som konverteres til NOVL 70° 1,5-2,5 mm².
Sweden’s second-largest city, Göteborg, needed to strengthen its power grid to replace cables at the end of their lifetime. As part of its upgrade project with NKT at the start of 2020, it upgraded out 94 kilometres of first-generation PEX cables with new NKT cables.
Sveriges näst största stad, Göteborg, behövde modernisera sitt kraftnät och byta ut uttjänta kablar. Som en del av uppgraderingsprojektet med NKT i början av 2020, ersattes 94 kilometer första generationens PEX-kablar med nya NKT-kablar.
NKT contributes to the green transformation of the UK power supply delivering export and array cable systems to Triton Knoll.
Our pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
Underground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
The Caithness-Moray project represents a £1.1bn capital investment by SSEN, centred on a submarine cable capable of carrying up to 1,200MW beneath the Moray Firth.
Produkte & Lösungen
Über NKT
Ihre Karriere
Nehmen Sie Kontakt zu uns auf
Melden Sie Ihr Anliegen
Folgen Sie uns auf
© NKT A/S